St Johns River State College Consolidated Project Management Plan Paper
Description
write 2 pages
APA
My part is: 3.2.7 and 3.2.8
3.2.7. Risk Management Plan
Specify the risk management plan for identifying, analyzing, and prioritizing project risk factors.
Specify plans for assessing initial risk factors and for the ongoing identification, assessment, and mitigation of risk factors throughout the life cycle of the project.
3.2.8. Project Closeout Plan
Identify the plans necessary to ensure orderly closeout of the project.
Specify the following: • a staff reassignment plan • a process for archiving project materials • a process for capturing project metrics in the business projects database • a process for postmortem debriefings of project personnel • a plan for preparation of a final report to include lessons learned and an analysis of project objectives achieved • plans for assuring that safety, privacy, and security requirements are met • special facilities or equipment specification • product installation plans • user training plans • integration plans • data conversion plans • system transition plans • product maintenance plans • product support plans