- Using finite capacity scheduling, draw a Gantt chart for the schedule (Marks 0.5)
- What is the makespan? (Marks 0.5)
- How much machine idle time is there? (Marks 0.5)
- How much idle time (waiting time) is there for each job? (Marks 0.5)
- When is each job delivered? (Marks 0.5)
- Which department is the bottleneck? (Marks 0.5)
- Calculate the machine utilization? (Marks 0.5)
- Draw a network for this project? (Marks 0.5)
- Make a forward pass and a backward pass to determine ES, LS, EF, and LF? (Marks 0.5)
- What are the critical path? (Marks 0.5)